cut a sphere in all 3 axis with center point as common point
of all axis.
u would be getting 2 lines and an arc
in other words
sphere is cut into 3 cuts in x,y,z directions
it is only similar
required number =H.C.F of (73-25),(97-73) & (97-25)
=H.C.F of 48 , 24 and 72 = 4 (c)
x (A to B by car) + y (B to A by cycle) is 7 hours
x (A to B by car) + x (B to A by car) is 7 minus 3 is 4 hours
2x is 4 and hence x is 2
2 + y is 7 and hence y is 5
y (A to B by cycle) + y (B to A by cycle) is 5 + 5 is 10 hours
Its 2 times faster than the other train
v1*t=v2
v2*t=4*v1
solving these two,we get
v2/v1=2
10%
the right liveli award
72 kmph
30%
suppose the area is 100 and it was increased by 69%, then
the area is 169 which it indicates the side of the square
is 13.. which means 30% increase in its side.
Total inversement =20000
Arun and vinay =40% ,40%
Kamal =20%
8 month gain = 4005
Arun and vinay share of 6 months=1201.5
Kamal share of 6 month = 600.75
Now Arun left, then remaining 2 month’s profits =1001.25
In this case kamal have 33.3% and vinay have remaining percentage of 1001.25
33.3% of 1001.25 is 333.4
Now, total share of kamal is 600.75+333.4=934.16
Explanation:
Let E1 be the event of drawing a red card.
Let E2 be the event of drawing a king .
P(E1 ∩ E2) = P(E1) . P(E2)
(As E1 and E2 are independent)
= 1/2 * 1/13 = 1/26
D
Let the number be X,
Instead of dividing the number by 10, i.e.,X*10.
he got the result as 100,
so, (X*10)=100
X=100/10
X=10.
BUt he has to divide X by 10,
so, X/10=10/10=1.
obviously the answer is 1.
Three man’s on day work = 1/6+1/7+1/8=73/168
three man’s can complete the work in 1/73/168 days
= 168/73 days
Now if they works together fro the alternet days they will
complete the worksin 2*168/73 days
(If three mans working for the alternate days then work
completion time will be doubbled)
17
1/x=1/5+1/10+1/30=lcm is 30.
->30/5=6
->30/10=3
->30/30=1
1/x=6+3+1=10
1/x=10/30=1/3=x=3
Ans is 3 hr.
22, 33, 69, 99, 121, 279, 594
B. 279
1600 years contain 0 odd day.
300 years contain 1 odd day.
94 years = (23 leap years + 71 ordinary years)
= (46 + 71) odd days
= 117 odd days, i.e., 5 odd days
Days from 1st January 1995 to 28th February 1995
= (31 + 28) days = 59 days
= (8 weeks + 3 days) = 3 odd days
∴ Total number of odd days
= (0 + 1 + 5 + 3) = 9 odd days i.e., 2 odd days.
So, the required day is Tuesday.
24 times