1) time =20mins,speed=15kmph=15*(5/18)=25/6 m/sec
distance=20*(25/6)=250/3 m
then 2) given as time =15min
speed=250/3*15=(50/9)*(18/5)kmph=20kmph
Barber
1+0^3=1
1+1^3=2
2+2^3=10
10+3^3=37
37+4^3=101
101+5^3=226
1,2,10,37,101,226……..
as a student iam intrested in learning new things.as a fresher i learnt this subject theoretically and iam waiting for an oppurtunity to do them in practical way if you hire me then i will give my best to increase companies reputation
30
3
1
Cousin
40
x – 30 = 1/4 x || *4
4x – 120 = x || -x + 120
3x = 120 || /3
x = 40
4, 5, 15, 49, 201, 1011, 6073
Correct option is A)
2nd term =(1stterm×1+2)=(4×1+2)=6
3rd term =(2ndterm×2+3)=(6×2+3)=15
4th term =(3rdterm×3+4)=(15×3+4)=49
5th term =(4thterm×4+5)=(49×4+5)=201 and so on
∴5 is wrong.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
option c is the answer
as
1/2 for household
1/4 for rent
1/5 for travel
remaining for deposit in bank(i.e) 1/2+1/4+1/5=19/20 ; 1-19/20=1/20
so 1/20 for deposit
1/20(x)=50
hence x=1000
option c is the answer