Recent Answer : Added by Admin On 2020-05-17 12:02:20:
6/(2+3)-(2+3)/6
=6/5-5/6
=(36-25)/30
=11/30
ans is 11/30
Ques:- Sam and Mala have a conversation. Sam says I am certainly not over 40. Mala says I am 38 and you are atleast 5 years older than me. Now, Sam says you are atleast 39. All the statements by the two are false. How old are they really?
Ques:- Are you willing to change your role and profile when required for a project?
Ques:- CMC not good paymasters. Can you work with low salary?
Ques:- WHAT WA YOUR PREVOUS EXP AND HOW YOU WILL ACHIEVE TEH TARGET
Ques:- A company contracts to paint 3 houses. Mr.Brown can paint a house in 6 days while Mr.Black would take 8 days and Mr.Blue 12 days. After 8 days Mr.Brown goes on vacation and Mr. Black begins to work for a period of 6 days. How many days will it take Mr.Blue to complete the contract?
Recent Answer : Added by mohammed shahnawz On 2022-08-14 16:45:52:
mr, blue was compplete the contract in 12 days
Ques:- The President of India addresses his resignation letter to the:
A. Prime Minister
B. Speaker of the Lok Sabha
C. Chief Justice of India
D. Vice President
Recent Answer : Added by Admin On 2022-09-27 16:58:57:
D. Vice President
Ques:- area of triangle=1/2*b*h base incresed by 4 times & height is devided by 2, the net effect of area.
Recent Answer : Added by Admin On 2020-05-17 12:00:14:
area is doubled.
actual area = 1/2 bh
after increase area = 1/2 *4b* h /2
=bh
1/2 *bh *2 = bh
therefore area is doubled
Ques:- It was calculated that 75 men could complete a piece of work in 20 days. When work was scheduled to commence, it was found necessary to send 25 men to another project. How much longer will it take to complete the work?
Recent Answer : Added by Admin On 2022-09-29 15:28:07:
One day work = 1 / 20
One mans one day work = 1 / ( 20 * 75)
Now:
No. Of workers = 50
One day work = 50 * 1 / ( 20 * 75)
The total no. of days required to complete the work = (75 * 20) / 50 =
30
Ques:- Qualification & Family Background? Total years of Experience? Why want to leave current Job.
Ques:- Which of the following statements drawn from the given statements are correct?Given:All watches sold in that shop are of high standard. Some of the HMT watches are sold in that shop.a) All watches of high standard were manufactured by HMT.b) Some of the HMT watches are of high standard.c) None of the HMT watches is of high standard.d) Some of the HMT watches of high standard are sold in that shop.
Ques:- The difference between the local value and face value of 7 in the numeral 657903 is
A. 901
B. 903
C. 6993
D. 7896
Recent Answer : Added by trupti sharma On 2022-01-16 17:20:41:
c
Ques:- Lets say you have being given work to collect data from all department heads and make a report presentation by Wednesday and present that report to your boss in the board meeting on Thursday, “How will you do that” say if 1 or 2 department heads don’t give you data, how will you convince them to give data?
Ques:- Name some pvt banks
Ques:- Can you accept bond for 3 years irrespective of your experience ?
Ques:- Worldwide size of designer wear industry is about?
A. Rs. 35 billion
B. Rs. 25 billion
C. Rs. 10 billion
D. Rs. 50 billion
Recent Answer : Added by Muhammad Imran On 2022-09-28 17:42:44:
It is About 35 Billion
Ques:- Why do you think you are suited for this job b for Position based on domain Expertise & Past Experience?
Ques:- What kind of person would you refuse to work with?
Recent Answer : Added by Michelle On 2022-03-09 16:33:30:
A rude person who doesn’t respect me
Ques:- Which one of the following is the number by which the product of 8 consecutive integers is divisible?
A. 4!
B. 6!
C. 7!
D. 8!
E. All of these
Recent Answer : Added by Robert Jude Mabirizi On 2021-11-09 15:53:23:
A
Ques:- Describe your dream house
Ques:- if a boat is moving in upstream with v1 km/hr and in the down stream it is moving with v2 km/hr then what is the speed of the stream.
Recent Answer : Added by Admin On 2020-05-17 12:00:03:
1.5 km/hour
Ques:- Why sales and why btech to pgdm
Ques:- Two pipes function simultaneously the reservoir will be filled in 12 hours. One pipe fills reservoir 10 hours faster than the other. How many hours does the faster pipe take to fill the reservoir?
Recent Answer : Added by Manik rattan On 2021-08-16 06:56:14:
suppose
pipe:
A -30 hours A’s effeciency (60/30) =2
60( lcm of 30 and 20)
B- 20 hours B’s effeciency (60/20)=3
time taken by both to fill = 60/5 =12 as given in question (effeciencies of both a+b =2+3=5)
time taken by faster pipe i.e b = 60/3 =20
Ques:- A traveler walks a certain distance. Had he gone half a kilometer an hour faster , he would have walked it in 4/5 of the time, and had he gone half a Kilometer an hour slower, he would have walked 2 ½ hr longer. What is the distance?
Recent Answer : Added by Nitesh On 2021-05-28 08:49:20:
d / (x+1/2) = 4/5 * t
and d / (x-1/2) = 5/2 + t
solving we get d = 15.
Ques:- Evaluate the expenditure on digging a well 14m deep and of 3m diameter at Rs.15 per cubic meter?
Ques:- What are your +ve and -ve qualities?
Ques:- Exploring capability to manage multiple projects and provide recommendations
Ques:- Suppose you are shortlisted for what reason you will leave the company in future?
Ques:- Current General Knowledge
Ques:- 1,2,3,5,?,10,15,30
Recent Answer : Added by Admin On 2020-05-17 12:04:34:
these r all factors of 30
1*30=30
2*15=30
3*10=30
5*6=30
like that
6/(2+3)-(2+3)/6
=6/5-5/6
=(36-25)/30
=11/30
ans is 11/30