3, 7, 6, 5, 9, 3, 12, 1, 15, (…..)
-1
A. 978626
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
9 and 16
16
According to the question:
⇒(x+5)(y−10)=300
⇒xy+5y−10x−50=xy
⇒5×300−10x−50=0
⇒−150+x2+5x=0
⇒x2+15x−10x−150=0
⇒x(x+15)−10(x+15)=0
⇒x=10 or −15
Price cannot be negative
So, As x>0,x=10.
I think –
1750 / 7 Years = 250
250 * 2% = 5
5 * 7 Years = 35
if am standing on a ballconi so i see the people what they
are doing and how they are handling with the people and
what they are taking to each and everybody.
3000