Answer: z and u
Explanation:
Y is to the right of U and exactly in front of V. Therefore,
U Y
V
Z is behind W and W and X are at extreme ends. So, W has to be to the right of Y. The final arrangement is as follows.
U Y W
X V Z Therefore, Z and U are at extreme ends is true.
x
a printer produced 176400 lines in 420 minutes
it produces 176400/420 lines per minute = 420
answer is : 420 lines per minutes
In the example first we have to find the area of the field
we have given the following values ,
cost of fencing per meter = Rs 1.50
Diameter of circular field = 28
We have to find the area , a = ?
We know that,
Area = 2 π r
= 2 x 22/7 x 14
= 2 x 22 x 2
= 44 x 2
= 88 sq. m
So, area of circle is 88 sq.m
Now just multiply it with 1.50
cost of fencing = 88 x 1.50
= Rs. 132
So, the cost of fencing the circular field is Rs. 132
9/32
For optimal size of a project team..
the % increase in staff size should be “Zero”
reason:
additional member directly proportional to increase in
staff size..
answer :
Let the distance which I walk to the station be x km Then Time needed to reach the station at 3 km/hr = (3x+602) hrs and
Time needed to reach the station at 4 km/hr = (4x+602) hrs But 3x+301=4x−301⇒3x−4x=−302=151
⇒124x−3x=151⇒12x=151⇒x=1512=54 km
x+y+z
—– = 6800
3
x>=6400
6400 + y + z = 20400
y + z = 14000
to get the greatest of y and z, lets assume y = 6400
so, z = 7600
so ANS is 7600
4400+(97 leap year )=4497
let x be sum.
SI of 18% for 1 year= x*18/100=0.18x;
SI of 18% for 2 years is 0.36x;
SI of 12% for 1 year= x*12/100=0.12x;
SI of 12% for 2 years is 0.24x;
Given, 0.36x-0.24x=840
0.12x=840
x=840/0.12=7000.
bogus, counterfeit, fake, false, illegitimate, sham, unreal
As fast as possible. For example, I will suitable with the working environment within one month.
26
20
1
6=1x2x3
24=2x3x4
60=3x4x5
120=4x5x6
210=5x6x7
336=6x7x8