1
The first number is 36
Step-by-step explanation:
let their common factor be ‘x’
hence,
the ratio be 3x/5x
hence, by condition;
(3x-9)/(5x-9)=9/17 ch upu
9(5x-9)=17(3x-9)
45x-81=51x-153
153-81=51x-45x
72=6x
x=72/6
x=12
the first number is 3x=3×12=36
16
( d ) Cannot be determined
Gain=(profit/c.p)*100
Gain =selling price-cost price =900-675
=225.
Gain=(225/675)*100.
=33.3%
suppose
pipe:
A -30 hours A’s effeciency (60/30) =2
60( lcm of 30 and 20)
B- 20 hours B’s effeciency (60/20)=3
time taken by both to fill = 60/5 =12 as given in question (effeciencies of both a+b =2+3=5)
time taken by faster pipe i.e b = 60/3 =20
I will deny
QTP(twins)SR
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Reliance
length of the base=3 times height
b=3h;
h=b/3;
so, 1/2bh=24
1/2b(b/3)=24
(b^2)/6=24
b^2=144
b=12
6
the qs here is talking about 50 states in USA.So if u remove
one from 50, which one would it be is the qs!!!
u should answer as either u would remove the state with
lowest population or state with less natural resources or
some thing else..
underroot(1-r^2)/3
$57.30