- Department of Water and Sanitation South Africa General Aptitude Interview Questions
- Department of Water and Sanitation South Africa Trainee Interview Questions
- Department of Water and Sanitation South Africa Personal Questions round Interview Questions
- Department of Water and Sanitation South Africa HR Interview Questions
- Department of Water and Sanitation South Africa Lead Interview Questions
Had is correct ! Anil went in right direction but ended up
with wrong answers
Soln: B lied ( see anil’s comment ) which implies B has not
stolen mule. So B could steal camel or sheep.
1) Lets assume B stole camel.
In that case, A lies ( refer – A says “B had stolen sheep”
), which implies A had stolen sheep ( becoz a lier cant
steal mule ). So A->sheep B->camel C->mule. But this cant
happen because C cant lie ( refer – C says ” B had stolen
mule” ).
2) Lets assume B stole sheep.
In that case, A is true ( refer – A says “B had stolen
sheep” ), which implies A had stolen mule. So A->Mule
B->Sheep C->camel. Here C lies ( refer – C says ” B had
stolen mule” )
SO ANS: answer A- mule, B-sheep, C camel
3000(4x/100) + 5000(2x/100)=10
(c)UW
45 km/hr
Let the distance between each pole be x m. Then, distance up to 12th pole = 11x m
∴ Speed = 11x22m/s
∴ Time to cover total distance up to 20th pole
= 19x×2411x
= 41.45 s
C
to find the root of f(x) = 0;
3.1
Bus started at 8:00
it travelled with 18mph…
distance of destination is 27 miles…
we know velocity=(distance)/time
i.e., time=27/18hours=3/2hours=90 min…
i.e., the bus reached destination at 9:30
the bus stayed for 30 min…
so the bus started return journey at 10:00
now the bus returned with velocity 18 + (18/2)=27mph
the taken to the bus to travel = 27/27=1 hour = 60 min…
so bus would be returned on 11:00…
Mixture is 1.2 L of A + 2.4L of B which is 3.6L total. 1.2L / 3.6L = 1/3 (0.33)
Length of train = 125Mtrs
Speed of man = 5Km/Hr
=(5*1000)/(1*3600)
=1.4M/s
Time taken for train to pass = 10s
Spd = D/T
Total Distance (Man distance+ Train Length)
#Distance covered by Man in 10s
D=Spd*T
= (1.4M/s*10s)
= 14Mtrs
#Train length = 125Mtrs
Total D = 14Mtrs + 125Mtrs
= 139Mtrs
Time taken = 10s
Sp = D/t
=139M/10s
=13.9M/s
1*2=2
2*2=4
2*4=8
8*4=32
Ans : 32