Friends,
The Answer given by ‘Gaurav Sharma’ is correct and
the approach (bottom to top) suggested by ‘Shailesh’ is
good. But with minor correction we can arrive the solution
using this approach:
After 5th loot, No. of breads left = 3
after 4th loot, no. of breads left = (3+0.5)x2 = 7
after 3rd loot, no. of breads left = (7+0.5)x2 = 15
after 2nd loot, no. of breads left = (15+0.5)x2 = 31
after 1st loot, no. of breads left = (31+0.5)x2 = 63
So, before 1st loot, no. of breads left = (63+0.5)x2 = 127
(T-P)-(U-Q)-(V-R)-(W-S)
S Opposite is Q
U sits the P and Q
Calculation:
⇒ If 1000 divided by 112, the remainder is 104. ⇒ 112 – 104 = 8 ⇒ If 8 is added to 1000 it will become the smallest four-digit number and a multiple of 112. ⇒ 1000 + 8 = 1008 ∴ The required result will be 1008.
My definition of success is being able to complete the task given to me in the provided timeline
TEACHER is written as VGCEJGT, how would DULLARD ?
T value is 19
V value is 21 ,
here we get to know that there is difference of 1 letter between them.
Answer: FWNNCTF.
Days taken by A to complete whole work= 140 days
Days taken by B to complete whole work= 105 days
A’s 1 day work= 1/140
B’s 1 day work= 1/105
On adding these together we get: 1/60 (1 day work by working together)
So, together they will be able to complete it in 60 days
FUHAZIBA
12*336/84=48
7/5 * 5/q = 7/10
35/5q = 7/10
q=10
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Son in law
Burn Rope One first, it will burn in 30 mins.Mark 30 mins and at the end of 30 mins now burn second rope from both sides (15 mins it will take ),and simultaneously burn third and last rope until it is half left.30+15= 45 , Remaining time 7.5 mins.By this time last rope is burnt half ,and now burn it from both sides as well it will exhaust in 7.5 mins. 30+15+7.5=52.5 measured.
21
A