Let cost for apple be a Cost for banana be b and Orange be c
So by first value expression becomes 17a + 13b + 9c =130 ———-1 therefore if you further solve a = (130 – 13b – 9c)/17 ———- 2 the second expression becomes: 13c + 7a + 10b = 100 ———- 3 If you put value of a in second expression it becomes: 13c + 7[(130 – 3b – 9c)/17] +10b = 100
Further if you solve you get value of b:
b = 10 – 2c ———-4
put value of b from 4 in 1
17a + 13 [10 – 2c] + 9c = 130
Further if you solve you find value of a
a = c ———-5
Put 5 in 3
13c + 7c + 10b = 100
further solve you get: c = 1 ———-6
from 5 and 6
a = c = 1 ———-7
Substitute value of c in expression 4
b = 10 – 2c b = 10 -2 * 1 b = 8 ———-8
therefore a + b + c = 10
R>P>Q>T
V>S>P
so the lightest is T.
Since the total train length passed the tunnel so the distance would be the length of train added to the tunnel legth
D=150+300=450 mt.
speed = distance/time
speed = 450/(40.5/3600)
speed =40,000 mt/sec
Answer: Option C two
I’m interested in this job because I can see that, in this role, my skills could help solve this problem within your company. I also see an opportunity for me to learn and grow these skills, so we both would benefit personally, professionally, and financially.
2, 6, 12, 20, 30, 42, 56, (…..)
Difference between 2 and 6 is = 4
Difference between 6 and 12 is = 6
Difference between 12 and 20 is = 8
Difference between 20 and 30 is = 10
Difference between 30 and 42 is = 12
Difference between 42 and 56 is = 14
So ne number will be with 16 Difference i .e 72
Therefore Answer will be 72
Hard work would mean spending long hours to complete my work without any shortcuts. It definitely ensures results but the process is long and stressful. Smart work would be aiming for the same results but with planning and prioritization of tasks.
15/46=0.32
let x be sum.
SI of 18% for 1 year= x*18/100=0.18x;
SI of 18% for 2 years is 0.36x;
SI of 12% for 1 year= x*12/100=0.12x;
SI of 12% for 2 years is 0.24x;
Given, 0.36x-0.24x=840
0.12x=840
x=840/0.12=7000.
Days taken by A to complete whole work= 140 days
Days taken by B to complete whole work= 105 days
A’s 1 day work= 1/140
B’s 1 day work= 1/105
On adding these together we get: 1/60 (1 day work by working together)
So, together they will be able to complete it in 60 days
1208.9
32 Km/hr
If both agree stating the same fact, either both of them speak truth of both speak false.
∴ Probability
=3/5×4/7+2/5×3/7=12/35+6/35=18/35