Hireup Interview Questions, Process, and Tips

Ques:- How was your progress measured? How were you rated?
Ques:- A starts from a place at 11.00 am and travels at a speed of 4 kmph , B starts at 1.00 pm and travels with speeds of 1 kmph for 1 hr , 2 kmph for the next hr , 3 kmph for the next hr and so on. At wht time will B catch up with A ?
Recent Answer : Added by DK BOSS On 2021-07-17 06:18:40:

the answer is At 9:48 PM
At 1:00 pm the difference between A & B = 8 km
after 2:00 pm ………………. = 11 km (as B’s speed
is 1 and A’s 4 km, then eqv speed=(4-1)=3 km)
After 3:00………………….. = 13 km (as B’s speed 2 km)
After 4:00………………….. = 14 km
after 5:00………………….. = 14 km (A’s speed= B’s
speed)
after 6:00………………….. = 13 km
after 7:00………………….. = 11 km
after 8:00………………….. = 8 km
after 9:00………………….. = 4 km
and now the eqv speed is= (9-4) =5 km/hr;
and the renaming distance is 4 km;
then, time=(60*4)/5=48 min;
then the meeting time is=9:00+48 min=9:48 pm;

Ques:- Tell me how did you spend your last weekend.
Ques:- Do you think this company is ambitious and if so, why?
Ques:- Have you worked earlier in construction site?
Ques:- Why do you think that we will appoint you?
Ques:- In what ratio must be a grocer mix two varieties of tea worth Rs. 60 a kg and Rs. 65 a kg so that by selling the mixture at Rs. 68.20 a kg he may gain 10%?
A. 3 : 2
B. 3 : 3
C. 3 : 4
D. 3 : 6
Recent Answer : Added by Testq On 2021-12-05 14:52:33:

Required Ratio=3:2

Ques:- It was calculated that 75 men could complete a piece of work in 20 days. When work was scheduled to commence, it was found necessary to send 25 men to another project. How much longer will it take to complete the work?
Recent Answer : Added by Admin On 2022-09-29 15:28:07:

One day work = 1 / 20
One mans one day work = 1 / ( 20 * 75)
Now:
No. Of workers = 50
One day work = 50 * 1 / ( 20 * 75)
The total no. of days required to complete the work = (75 * 20) / 50 =
30

Ques:- Would you be interested in relocating to Gandhinagar?
Ques:- What I do special in my life rather than study
Ques:- Which among the following countries has joined World Trade Organisation as the 153rd member
Ques:- In a flight of 600 km, an aircraft was slowed down due to bad weather. Its average speed for the trip was reduced by 200 km/hr and the time of flight increased by 30 minutes. The duration of the flight is?
Recent Answer : Added by H Chris Sparks On 2022-04-02 06:57:47:

1.5 hrs

Ques:- How can you be an asset to our Organization
Ques:- The prime numbers dividing 143 and leaving a remainder of 3 in each case are
A. 2 and 11
B. 3 and 7
C. 5 and 7
D. 11 and 13
Recent Answer : Added by Mbabazi Nuriat On 2022-05-17 08:55:04:

D

Ques:- In the following figure:A B C D E F G H IEach of the digits 1, 2, 3, 4, 5, 6, 7, 8, and 9 is:a)Represented by a different letter in the figure above.b)Positioned in the figure above so that each of A + B + C,C + D +E,E + F + G, and G + H + I is equal to 13.Which digit does E represent?
Ques:- Three containers are of 15,10 and 6 ltrs capacity. Initially its in configuration (15,0,0). Make it to configuration (2,8,5).
Ques:- What is black money?
Ques:- A room is 4 meters 37 cm long and 3 meters 23cm broad. It is required to pave the floor with minimum square slabs. Find the number of slabs required for this purpose?
Ques:- what is your approach to working under pressure?
Recent Answer : Added by Admin On 2020-05-17 12:05:57:

under pressure a person more effort to his work

Ques:- Do your skills match this job or another job more closely?
Ques:- A man engaged a servant on the condition that he would pay him Rs.900 and a uniform after one year service. He served only for 9 months and received uniform and Rs.650, find the price of the uniform?
Recent Answer : Added by Ghadir On 2021-12-23 16:25:54:

12 month=>900Rs+Uniform
1month:75 => 9month:675
675-650=25 =>price of Uniform

Ques:- How would the amends in monetary policy by Urjit Patel affect Indian economy?
Ques:- Are you interested in helping others?
Ques:- A train 800 m long is running at a speed of 78 km/hr. If it crosses a tunnel in 1 min, then the length of the tunnel is?
Recent Answer : Added by Admin On 2022-09-28 18:39:42:

Let length of tunnel is x meter
Distance = 800+x meter
Time = 1 minute = 60 seconds

Speed = 78 km/hr = 78*5/18 m/s = 65/3 m/s

Distance = Speed*Time
=>800+x=653∗60=>800+x=20∗65=1300=>x=1300−800=500

Ques:- On a empty chessboard, a horse starts from a point (say location x,y) and it starts moving randomly, but once it moves out of board, it cant come inside. So what is the total probability that it stays within the board after N steps.
Ques:- Cost of an item is x. It’s value increases by p% and decreases by p% Now the new value is 1 rupee, what is the actual value ?
Recent Answer : Added by Admin On 2020-05-17 12:01:48:

original cost is 100^2 / (100^2 – p^2) Rs

Ques:- You have given two blank faced dice… on both dice on each face you write any number you want from 0 to 9. now you are sitting and somebody comes and ask you the date of current month. you have show two dice to tell him the date. is it possible If yes how
Ques:- How will you rate yourself .
Ques:- Some toys were distributed equally among 18 children in such a way that the number of toys each child gets is equal to the total number of children and after distribution 6 toys are left out. What was the total number of toys?
A. 324
B. 330
C. 336
D. 320
E. None of these
Recent Answer : Added by Admin On 2020-05-17 12:03:59:

(b) 330 is the amswer
as the no of toys are equall to no of students
18*18= 324
left out toys afetr distribution = 6
so 324+6= 330

Ques:- A company installed 36 machines at the beginning of the year. In March they installed 9 additional machines and then disconnected 18 in August. How many were still installed at the end of the year.
Recent Answer : Added by Admin On 2020-05-17 12:01:31:

27

Contact with us regarding this list

Devendra Bhardwaj With a decade of experience as a Job Hiring Expert, I am a results-driven professional dedicated to elevating recruitment strategies. My expertise lies in navigating the dynamic landscape of talent acquisition, employing innovative approaches to attract, assess, and secure top-tier candidates. I excel in optimizing hiring processes, leveraging cutting-edge technologies, and fostering collaborative relationships with stakeholders. A keen understanding of industry trends allows me to stay ahead, ensuring a competitive edge in securing the best talent for your organization. I am passionate about connecting the right people with the right opportunities and thrive in creating impactful, streamlined recruitment solutions.

Scroll to top