To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
let a = 9 * 9 * 9;
let b = 12 * 12 * 12;
let c = 15 * 15 * 15;
sum = a + b + c;
edge = Math.cbrt(sum);
console.log(edge);
=36*84/ lcm
= 36 * 84 / (12 * 3 * 7 )
HCF= 12
c
Question
DISSENTIAL
V is sitting opposite to s
I have seen a few say 25% as an answer to this. But looks
like their math isn’t good and is extremeley complex to
have an asnwer of 25% to this question. Consider – Rs.1.00/-
per mango; so 40 mangoes = Rs.40.00/-, implies Rs.4.00/-
extra at the end of the deal. So he’s left with Rs.44.00/-
after selling 40 mangoes implies a profit of Rs.4.00/- over
Rs.40.00 = 44/40 = 110% which means his profit is 10%.
Hope this helps…
Thanks.
1km is equal to 1000 meter
Therefore 225 meter is how many km
Then we have to cross multiply
1km – 1000 meter
? – 225 meter
0.225 km
Then we have to apply formula
Speed = Distance/Time
Speed = 0.225/12 sec
= 0.01875×3600sec
= 67.5
Therefore speed of train is = 67.5
divisible by 8 – 124
” 12 – 83
” both – 41
124 + 83 – 41 = 166
999 – 166 = 833
ans is 833…..
Let A=5x,B=3x,C not given so consider C=x
In triangle total angle=180°
A+B+C=180°
5x+3x+x=180°
9x=180°
X=180°/9
X=20°
A=5(20)=100°
B=3(20)=60°
C=20°
Therefore A=100° is the largest angle
Ans: 100°