Here is the ans with explanation…..
Just divide 48 hours into 8 parts…
for flowchart its 1/4 so it is 2/8 = 12hours
For Coding it is 3/8 = 18 hours
the rest is again 3/8 = 18 hours for debugging..
length of the base=3 times height
b=3h;
h=b/3;
so, 1/2bh=24
1/2b(b/3)=24
(b^2)/6=24
b^2=144
b=12
Total distance to cover = 132 +110 = 242m
Speed = 72kn/hr = 20m/s
time = 242/20 = 12.1 sec.
first fill 3quart pail and pour in 5quart pail.fill again 3
quart pail and fill remaining 2 quarts in 5 quart
pail.hence 1 quart remains in 3quart pail.empty 5quart pail
and pour 1 quart from 3 quart pail. also add another 3
quart from 3 quart pail. hence 1 + 3 quarts = 4 quarts.
i think it is a and b
Balls- B1, B2, B3, B4, B5, B6, B7, B8, B9.
Group1 – (B1, B2, B3), Group2 – (B4, B5, B6), Group3 – (B7, B8, B9)
Now weigh any two groups. Group1 on left side of the scale and Group2 on the right side.
When weighing scale tilts left – Group1 has a heavy ball or right – Group2 has a heavy ball or balanced – Group3 has a heavy ball.
Lets assume Group 1 has a heavy ball.
Now weigh any two balls from Group1. B1 on left side of the scale and B2 on right side.
When weighing scale tilts left – B1 is the heavy or tilts right – B2 is the heavy or balanced – B3 is the heavy.
let the 4 digit number be ABCD.
First Digit is A :
Therefore; according to the question
A=B/3
B=3A
C=A+B=A+3A=4A
D=3B=3(3A)=9A
Since the last Digit is D and it can neither be double-digit nor 0 ;
Therefore ;
A=1;
B=3A=3(1)=3
C=A+B=1+3=4
D=9A=9(1)=9
Therefore, the 4 digit number is 1349.
444km
Since the speed diff is 5km/h
It takes 12 hrs to cover 60 extra kms
Therefore in 12 hrs the total dist covered is
Relative speed×time=(21+16)×12=444 kms
Time =9 seconds
Speed =(60×518) m/sec=(503)m/sec
∴ Speed =DistanceTime
Length of the train (Distance) = (Speed × Time) = (503×9) m=150 m.
FUHAZIBA
only if the results are greater than my input
72
avg of 10nos.=23==>23*10=230
if each no increased by 4 ==> 4*10=40
then new avg is giveen by : 230+40=270
270/10=27
hence the new avg =27