150
8, 7, 11, 12, 14, 17, 17, 22, (…..)
20
Answer:
24
Step-by-step explanation:
A + B = 40.
And at Rs 7 a kg for 40 kg, you want a total of Rs.280.
So the second equation is 9A + 4B = 280
From the first equation: B = 40 – A
and sub into the second equation:
9A + 4(40-A) = 280
9A + 160 – 4A = 280
5A = 120
A = 24.
And you should check: B should equal 40-24 = 16. Check with the final equation: 9*24 + 4*16 = 216 + 64 = 280. So it works.
Your answer, of course, is A = 24
No sentence can end with because because, because is a conjunction
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
bogus, counterfeit, fake, false, illegitimate, sham, unreal
Length of train = 125Mtrs
Speed of man = 5Km/Hr
=(5*1000)/(1*3600)
=1.4M/s
Time taken for train to pass = 10s
Spd = D/T
Total Distance (Man distance+ Train Length)
#Distance covered by Man in 10s
D=Spd*T
= (1.4M/s*10s)
= 14Mtrs
#Train length = 125Mtrs
Total D = 14Mtrs + 125Mtrs
= 139Mtrs
Time taken = 10s
Sp = D/t
=139M/10s
=13.9M/s
A perfect square is a square number of a digit. eg 64 is a perfect number, a square of 8
Now digits AB9 is a square number of a number.
AB9 Can also be written as A multiply by B multiply by 9
Get the Square root of AB9
Assumption, A=1, B=1
1*1=1=A, 1*1=1=B Therefore,
Square root of A = A, B = B and 9=3
Therefore
An odd number is a number indivisible by 2.
for example 1,3,5,7…….
Therefore Squares A*B*9= AB9
Where a=1, b=1, 3 as digits.
Conclusion
A=1 is an odd number
b)Brother or Sister
Because Bis related to either Brother or Sister.
each pencil 100/25 = 4
each book 100/15 = 6.66
100 – 15 = 85
85-5*4 = 65
65/6.66 = 9
he can buy 9 books that is not in given options currently so
answer is NONE
Question does not clarify if its simple interest or compound interest
Tree
s=a+(a+10)+(a+10+10)+(a+10+10+10)
s=4a+60
a=(s-60)/4