4, 5, 15, 49, 201, 1011, 6073
Correct option is A)
2nd term =(1stterm×1+2)=(4×1+2)=6
3rd term =(2ndterm×2+3)=(6×2+3)=15
4th term =(3rdterm×3+4)=(15×3+4)=49
5th term =(4thterm×4+5)=(49×4+5)=201 and so on
∴5 is wrong.
( C ) Crawl
tan 30=h/x
tan 15=h/100+x
so h/tan 30=(h/tan 15)-100
=33.33app
0,8x= y
y – 0,7y = 270
y= 270 / 0,3
y=900
0,8x=900
x=1125
2hr 24min
Let ‘x’ be the number of perons in the group and let ‘y’ be
amount per head which they have to pay.
Then xy = 2400.
or y = 2400/x
Since two friends have forget the purse, x-2 persons should
share the total amount(2400).
If they share, they have to make an extra contribution of
Rs 100 to pay up the bill
That is x-2 persons should pay y+100 each
or (x-2)(y+100) = 2400
or y+100 = 2400/(x-2)
or y = 2400/(x-2) – 100
Therefore we have got two equations namely,
y= 2400/x and y = 2400/(x-2) – 100
Comparing these two, we get
2400/x = 2400/(x-2) – 100
Solving this we get
x^2 – 2x -48 = 0
or (x-8) (x+6) = 0
or x = 8 or x = -6
Since ‘x’ denote the number of persons, it should be
positive.
So, x = 8.
mausi
100
7 : 3
31
d
32000
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
8+3+4=15
15+(7)=22
22 is divisible by 11.
So,7 is right answer. Option C
C
How breadth is 19.84..?
Apply Pythagoras therom,
a^2+b^2=c^2,
Lets Assume
c is hypotenuse or diagonal,
a is length or opposite side,
b is breadth or adjacent side,
Then,
256+b^2=400
b^2=144
b=12,
So the breadth is 12 cm
Loved by our community
17 people found it helpful
author link
NabasishGogoi
Ace
686 answers
168.2K people helped
0L -> 1 way
1L -> 3 ways
2L -> 7 ways
3L -> 4 ways
4L -> 1 way
total 16 ways