- Naval facilities engineering command (navfac) General Aptitude Interview Questions
- Naval facilities engineering command (navfac) Trainee Interview Questions
- Naval facilities engineering command (navfac) Personal Questions round Interview Questions
- Naval facilities engineering command (navfac) HR Interview Questions
- Naval facilities engineering command (navfac) Lead Interview Questions
16
Length of train = 125Mtrs
Speed of man = 5Km/Hr
=(5*1000)/(1*3600)
=1.4M/s
Time taken for train to pass = 10s
Spd = D/T
Total Distance (Man distance+ Train Length)
#Distance covered by Man in 10s
D=Spd*T
= (1.4M/s*10s)
= 14Mtrs
#Train length = 125Mtrs
Total D = 14Mtrs + 125Mtrs
= 139Mtrs
Time taken = 10s
Sp = D/t
=139M/10s
=13.9M/s
AB
Hockey
Answer: 450
Explanation:
10 * 150 = 1500
3 * 100 + 5 * 150 = 1050
1500 – 1050 = 450
40358
Reliable Assistance: I promise to provide reliable and accurate assistance in answering questions, providing information, and engaging in meaningful conversations. I strive to deliver helpful and relevant responses to the best of my abilities, drawing from the vast knowledge and information I have been trained on.
Continuous Improvement: I promise to continuously improve my capabilities and expand my knowledge base. As technology evolves and new information becomes available, I aim to stay up-to-date and provide the most accurate and relevant information possible. I strive to enhance my understanding of different topics and improve the quality of my responses over time.
Respectful and Ethical Interaction: I promise to interact with users in a respectful and ethical manner. I am programmed to respect user privacy, confidentiality, and cultural sensitivities, aiming to provide a positive and helpful experience for those who engage with me.
Please note that while I can provide valuable assistance and information, there are certain tasks that may be better suited for human professionals with expertise in specific fields.
12 %
1506
A will finish work in 8 days (4days with B and 4 days with C).
let A goes up and B comes down.
assume A takes 1 step in 1sec.
hence,B takes 5 steps in 1sec.
50 steps ll be moved by A in 50/1=50secs
125 steps ll be moved by B in 125/5=25 secs
hence speed of escalator=(difference of no of
steps)/(difference of time)
speed=(125-50)/(50-25)= 3 steps/sec
hence during upward journey of 50secs by A,total steps=50 by
A and 150 by escalator..total=150+50=200
during downward journey of 25 secs by B,total steps=125 by B
and 75 by escalator..total=125+75=200steps.
ANS:200 steps
Balls- B1, B2, B3, B4, B5, B6, B7, B8, B9.
Group1 – (B1, B2, B3), Group2 – (B4, B5, B6), Group3 – (B7, B8, B9)
Now weigh any two groups. Group1 on left side of the scale and Group2 on the right side.
When weighing scale tilts left – Group1 has a heavy ball or right – Group2 has a heavy ball or balanced – Group3 has a heavy ball.
Lets assume Group 1 has a heavy ball.
Now weigh any two balls from Group1. B1 on left side of the scale and B2 on right side.
When weighing scale tilts left – B1 is the heavy or tilts right – B2 is the heavy or balanced – B3 is the heavy.
d