Ques:- Which is the heaviest body of our solar system?
Ques:- A,B and C needs 8, 12 and 16 days respectively to finish a task. How many days will it take if A works for 2 days then B works on it until 25% of the job is left for C to do, and C completes the work?
Recent Answer : Added by Deven Sharma On 2023-05-31 18:36:37:
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Ques:- 6*12*15 is the volume of some material. How many cubes of edge 3 can be inserted into it?
Recent Answer : Added by Admin On 2020-05-17 12:01:50:
ans: 40
6/3*12/3*15/3=40
Ques:- Tell us what you like the most and what not in your professional life.
Ques:- What’s your absenteeism record like?
Ques:- Rajan got married 8 years ago. His present age is 6/5 times his age at the time of his marriage. Rajan’s sister was 10 years younger to him at the time of his marriage. The age of Rajan’s sister is:
Recent Answer : Added by Admin On 2022-09-29 18:35:16:
38 years
Let Rajan’s present age be x years. Then, his age at the time of marriage = (x – 8) years.
x = 65(x−8)
⇒5x=6x−48
⇒x=48 years
Rajan’s sister’s age at the time of his marriage = (x – 8) – 10 = (x – 18) = 30 years
∴ Rajan’s sister’s present age = (30 + 8) years = 38 years
Ques:- There are two balls touching each other circumferencically. The radius of the big ball is 4 times the diameter of the small all. The outer small ball rotates in anticlockwise direction circumferencically over the bigger one at the rate of 16 rev/sec. The bigger wheel also rotates anticlockwise at N rev/sec. What is 'N' for the horizontal line from the centre of small wheel always is horizontal.
Recent Answer : Added by vignesh On 2021-03-20 17:32:38:
64
Ques:- When you are part of a team that is working exceptionally well, what do you think the reasons are for its success?
Ques:- If the project already started and you hired in the middle of the project? What will you do?
Ques:- Number Series 3,18,4,24,5,30,?
Recent Answer : Added by Rohini kale On 2021-12-23 16:25:58:
6,36
Ques:- What do you mean by customer service?
Ques:- If Log2 x – 5 Log x + 6 = 0, then what would the value / values of x be?
Ques:- Three pipes A, B and C can fill a tank in 6 hours. After working at it together for 2 hours. C is closed A and B can fill the remaining par in 7 hours. The number of hours taken by C alone to fill the tank is?
Recent Answer : Added by Mohit Hurkat On 2022-01-08 16:07:14:
13.5
Ques:- TELL US SOMETHING ABOUT OUR COLLEGE?
Ques:- X, Y and Z can do a piece of work in 24, 30 and 40 days respectively. They start the work together but Z leaves 4 days before the completion of the work. In how many days is the work done?
Recent Answer : Added by Admin On 2022-09-29 17:23:19:
One day’s work of A, B and C = (1/24 + 1/30 + 1/40) = 1/10.
C leaves 4 days before completion of the work, which means only A and B work during the last 4 days.
Work done by A and B together in the last 4 days = 4 (1/24 + 1/30) = 3/10.
Remaining Work = 7/10, which was done by A,B and C in the initial number of days.
Number of days required for this initial work = 7 days.
Thus, the total numbers of days required = 4 + 7 = 11 days.
Ques:- If you have a chance to purchase shares of company will you purchase or not
Ques:- Money and work both are like siblings. But I believe when you work hard; money will flow to you. So work is more important than money. Only hard work can help you put another feather in your success cap.
Ques:- WHY YOU CHOOSING THE HR SPELISATION
Ques:- What is full form of INDIA
Ques:- What specifically do you do to set an example for your employees?
Ques:- What would u do, if u become a prime minister of urcountry for six months
Ques:- Tell us when in past you were able to demonstrate your leadership skils.
Ques:- If you come onboard, give me a general idea of what your first overall tasks will be as far as starting a quality effort.
Ques:- Wat will u do if not selected?????
Ques:- what is the lcm of under root 2 and under root 3
Ques:- Which one of the following numbers is divisible by 3?
A. 2345678
B. 2876423
C. 4006020
D. 9566003
Recent Answer : Added by Ramyadevi On 2021-10-22 09:13:10:
The correct ANS: option C
Ques:- The sum of all the prime numbers from 1 to 20 is
A. 75
B. 76
C. 77
D. 78
Recent Answer : Added by nikita mane On 2022-08-14 16:32:25:
77
Ques:- In what ratio must a grocer mix two varieties of pulses costing Rs. 15 and Rs. 20 per kg respectively so as to get a mixture worth Rs. 16.50 per kg?
A. 3 : 7
B. 5 : 7
C. 7 : 3
D. 7 : 5
Recent Answer : Added by N On 2021-11-15 17:00:11:
7 : 3
Ques:- What has been your greatest achievement in terms of employee relations?
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.