Ques:- Working skills and experience details
Ques:- 587 x 999 = ?
A. 586413
B. 587523
C. 614823
D. 615173
Ques:- Why you have chosen Polymer in graduation? Why MBA in Finance?
Ques:- Design engineer or Vendor development ?
Ques:- General discussion in second round
Ques:- What specifically do you do to set an example for your employees?
Ques:- A+B+C+D=D+E+F+G=G+H+I=17 where each letter represent a number from 1 to 9. Find out what does letter D and G represent if letter A=4. give the steps
Recent Answer :
: d=5
g=1
a=4, b=6,c=2,d=5,e=8,f=3,g=1,h=9,i=7
Ques:- Which is important experience or pay ?
Recent Answer :
: I think experience because if experience brings pay. If someone having experience in any work then he/she can work easily. Although pay is important but not more then experience
Ques:- Tell me about your favorite colour?
Ques:- Why do you think this job will be benefit to you?
Ques:- To which the fourth book of Kautilyas Arthashastra deals with
Ques:- What will be the value of 25 mps in kmph?
Recent Answer :
: 10000
Ques:- A person walks 4 km towards west, then turns to his right to travel 9 km. He turns towards east and travels 12 km. Finally, he travels 3 km towards south. How far is he from the initial position (in km) ?
Recent Answer :
: Answer is 10km
Ques:- A salt manufacturing company produced a total of 5000 tonnes of salt in January of a particular year. Starting from February its production increased by 100 tonnes every month over the previous months until the end of the year. Find its average monthly production for that year?
Recent Answer :
: 516 tones
Ques:- 2. Which technologies worked on before?
Ques:- Complete the following series.
9, 11, 15, 23, 39, ?
9, 11, 15, 23, 39, ?
A. 42
B. 56
C. 64
D. 71
Recent Answer :
: 71
Ques:- Sum of two consecutive even terms lacks by 98 from their product. What is the sum of these numbers?
Recent Answer :
: 12, 10
Ques:- In what time will a train 100 m long cross an electric pole, it its speed be 144 km/hr?
Recent Answer :
: 2.5 sec
Ques:- If Rs 20/- is available to pay for typing a research report & typist A produces 42 pages and typist B produces 28 pages. How much should typist A receive?
Recent Answer :
: Total Pages = 42+28 = 70 pages
for 70 pages we give Rs.20/-
and for 42 pages we give x
thus x = (42×20)/70
x = 12
The Answer = 12/-
Ques:- There are 5 red shoes, 4 green shoes. If one drasw randomly a shoe . what is the probability of getting redshoe
Recent Answer :
: 5c1 / 9c1
Ques:- If 1/4 of the time from midnight plus 1/2 of the time from now to midnight is the present time, then What is the present time?
Ques:- What skills do use when you need to influence the way other people think?
Ques:- Richard is a strange liar. He lies on six days of the week, but on the seventh day he always tells the truth. He made the following statements on three successive days: Day 1: “I lie on Monday and Tuesday.” Day 2: “Today, it's Thursday, Saturday, or Sunday.” Day 3: “I lie on Wednesday and Friday.” On which day does Richard tell the truth?
Recent Answer :
: Tuesday
Ques:- There are twelve consecutive flags at an equal interval of distance. A man passes the 8th flag in 8 seconds. How many more seconds will he take to pass the remaining 4 flags?
Recent Answer :
: 4.5
Ques:- What are the qualities do u have to give 50% hike?
Ques:- Showing the man receiving the prize, Saroj said, “He is the brother of my uncle’s daughter.” Who is the man to Saroj?
Recent Answer :
: Cousin
Ques:- Six persons A,B,C,D,E & F went to solider cinema. There are six consecutive seats. A sits in one of the seats followed by B, followed by C and soon. If a taken one of the six seats , then B should sit adjacent to A. C should sit adjacent A or B. D should sit adjacent to A, B,or C and soon. How many possibilities are there?
Ques:- A power unit is there by the bank of the river of 750 mtrs wide. A cable is made from power unit to power plant opposite to tht of the river and 1500 mtrs away from the power unit. the cost of cable above water and below water is Rs12 and Rs 15. Find the total cost for cable laying ?
Recent Answer :
: if rs 12 and rs 15 per meter then 750*12+750*15
Ques:- Tell us what you like the most and what not in your professional life.
Ques:- If the project already started and u hired in the middle of the project?what will u do?
A