13. 253, 136, 352, 460, 324, 631, 244
324
the sum of all = 10
Accept
324 = 3+2+4 =/=10 (NOT EQUAL TO 10)
a. (x+y)'=x'.y' b. (x'+y')'=x.y
c. (x'.y')'=x+y d. (x'+y')'=x'.y'
C
Let cost for apple be a Cost for banana be b and Orange be c
So by first value expression becomes 17a + 13b + 9c =130 ———-1 therefore if you further solve a = (130 – 13b – 9c)/17 ———- 2 the second expression becomes: 13c + 7a + 10b = 100 ———- 3 If you put value of a in second expression it becomes: 13c + 7[(130 – 3b – 9c)/17] +10b = 100
Further if you solve you get value of b:
b = 10 – 2c ———-4
put value of b from 4 in 1
17a + 13 [10 – 2c] + 9c = 130
Further if you solve you find value of a
a = c ———-5
Put 5 in 3
13c + 7c + 10b = 100
further solve you get: c = 1 ———-6
from 5 and 6
a = c = 1 ———-7
Substitute value of c in expression 4
b = 10 – 2c b = 10 -2 * 1 b = 8 ———-8
therefore a + b + c = 10
150m
I will try to find that person
Or give that bag to police ..
Days taken by A to complete whole work= 140 days
Days taken by B to complete whole work= 105 days
A’s 1 day work= 1/140
B’s 1 day work= 1/105
On adding these together we get: 1/60 (1 day work by working together)
So, together they will be able to complete it in 60 days
445, 221, 109, 46, 25, 11, 4
C.46
4+7
11+(7*2)
25+(7*2*2)
53+(7*2*2*2)
109+(7*2*2*2*2)…..
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Ratio: 3/4