i am looking for a cyber security expert job
Petroleum
121
My definition of success is being able to complete the task given to me in the provided timeline
These both ans are wrong Instead of cutting it vertically we cut it horizontally. we got 2 equal halves.
( a ) Treatment
a = 2
d = 5 – 2 = 3
Then 12th term is :
This in arithmetic progression
L = a + (12 – 1) d
L = 2 + 11 * 3
L = 2 + 33 = 35
2nd
In this question only one data is given ie., hole length - 6". In the question there is no mistake.
Find the answer.
volume of a sphere is 4/3 * pi * r^3
by drilling a hole 6 inches long the volume of the sphere is
not affected bcos the hole is a 1 dimension quantity..(say a
straight line) n so it does not have any value w.r.t volume…
hence the volume of the sphere does not change..
Complete step-by-step answer:
Investment made by A for 1 year, IA=2000
Investment made by B for 2 year,
IB=2×3000IB=6000
Investment made by C for 2 year,
IC=2×4000IC=8000
The ratio of their investment is given by
IA:IB:IC=2000:6000:8000
To simplify the ratio divide it by 1000,
IA:IB:IC=2:6:8
Now again to simplify divide the ratio by 2,
IA:IB:IC=1:3:4
The total parts of this investment =1+3+4=8
A’s share in the investment is 1 out of the 8 parts; B’s share is 3 out of 8 while C’s share is 4.
Therefore, the profit share of A’s investment of Rs. 2000=18×3200=400.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Spade 13/52 = 1/4
King 4/52 = 1/13
Spade OR King 13/52 + 4/52 – 1/52 (because the King of Spades is in both groups) = 16/52 = 4/13
P Q R S
TP -> UQ -> RV -> SW
Answers-
U sits opposite to S
Q sits in between S and R (after interchange)