Let x and y be the two numbers. And x > y.
Then,
x + y = 80—–(1)
y=80-y
Also,
x = 4y – 5
Solving the two equations,
80 – y = 4y – 5
85 = 5y
Therefore, y = 17
put the value of y in equation(1)
then
x+y=80
x+17=80
x=63
the numbers are 17&63
Ans : – 215
Explanation :-
1^3 = 1-1=0
2^3 = 8-1 = 7
3^3 = 27-1=26
4^3 = 64 – 1 = 63
5^3 = 125-1 = 124
Hence, Ans is
6^3 = 216-1=215
451 times.
Explanation: There are 60 minutes in an hour.
In ¾ of an hour there are (60 * ¾) minutes = 45 minutes.
In ¾ of an hour there are (60 * 45) seconds = 2700 seconds.
Light flashed for every 6 seconds.
In 2700 seconds 2700/6 = 450 times.
The count start after the first flash, the light will
flashes 451 times in ¾ of an hour.
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
B. 32%
volume of cylinder=volume of plane
pi*r*R*H=L*B*H
16PI*H=176
SO h= length=176/16*pi
ANser is 44pi
180*2/3 = 60degree
4
Either 4 or (-)4
21 days