1, 2, 4, 8, 16, 32, 64, (…..), 256
128
Ans 200
that he will lost 1.5 ltr in an hour
so he will lost that 10 ltr in 10/1.5=6.67hour
distance travelled in 6.67 hour is=30*6.67=200 km
but how?
In this question only one data is given ie., hole length - 6". In the question there is no mistake.
Find the answer.
volume of a sphere is 4/3 * pi * r^3
by drilling a hole 6 inches long the volume of the sphere is
not affected bcos the hole is a 1 dimension quantity..(say a
straight line) n so it does not have any value w.r.t volume…
hence the volume of the sphere does not change..
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
Divide 30*60 seconds by LCM of Numbers =15
2a; 2a+2; 2a+4; 2a+6; 2a+8; 2a+10
t_2 + t_6 = 24 => 2a+2 + 2a + 10 = 24 => a = 3
therefore t_4 = 2(3) + 6 = 12
45 km/hr
17and+-12=5-48=-43
length of the base=3 times height
b=3h;
h=b/3;
so, 1/2bh=24
1/2b(b/3)=24
(b^2)/6=24
b^2=144
b=12
U is the answer as
T is sitting opposite to R and W is sitting opposite to U
16 poles per min
48kmph=48000 meters per hr
=800 meters per min
800/50=16 poles per min
1, 1, 2, 6, 24, 96, 720
C. 96
Let 10’splace digit is x and unit’s place digit y
First milestone : 10x+y
Second milestone : 10y+x
Third milestone: 100x+y
Since the speed is uniform so
Distance covered in first Hr = Distance covered in Second Hr
(10y+x)-(10x+y) = (100x+y)-(10y+x)
After solving, we get —-> y=6x but since x and y are digits so only possible combination is x=1 and y=6,
So average speed = 45 KM/HR
43