10, 25, 45, 54, 60, 75, 80
54
the answer is 45 km/h
Define x:
Let the total distance be x.
Find the time needed in terms of x for speed at 30 km/h:
Find the time needed in term of x for 40 km./h:
Find the difference in time:
Solve x:
Find the total time needed to for the whole journey:
Given that he was 40 mins late:
Find the minimum speed needed:
Answer: The minimum speed is 45 km/h
Days taken by A to complete whole work= 140 days
Days taken by B to complete whole work= 105 days
A’s 1 day work= 1/140
B’s 1 day work= 1/105
On adding these together we get: 1/60 (1 day work by working together)
So, together they will be able to complete it in 60 days
2years
7
When none of the digits are repeated:
The hundred’s place can be filled by any of the digits: 2, 3, 5, 6, 7 or 8 except the one which has already been used at the thousand’s place, so it can be filled in 5 ways.
Similarly tens’ place can be filled in 4 ways: only those 4 numbers which have not been use either at hundred’s or thousand’s place.
Unit’s place can be filled in only 3 ways. So, total number of nos. Possible =4×5×4×3= 240
we consider a round shape cake.then cut in 2 equal parts in cut into center and next you have to cut its side by center then you have to get 8 equal parts in 3 exact cut
total distance to travel the end of the train = 360 + 140 = 500 m
speed of train 45000m/60min = 750m/min or 750m/60sec
(500m*60sec)/750m=40sec the time will take to pass
A certain sum amounts to Rs. 1725 in 3 years
and amounts to Rs.1875 in 5 years
so interest of 2 years = 1875 -1725
= 150
so interest of 1 year = 75
so interest of 3 years = 75 × 3 =225 rs
so , Principal = Amount – SI
= 1725 – 225
= 1500 rs
now ,
S.I. = P × N × R /100
75 = 1500 × 1 × R /100
R = 75 / 15
R = 5%
1200 meter
let (xy) be original number.
then, 10y + x +45 = 10x + y; eq 1
and x + y = 13; eq 2
solve ab equation,
then xy = 94;
ans: A/2
u get a diamond shape when u join those mid points
consider the 4 unshaded triangles
and u can form 2 square
when u analyse the squares u will get the answer