If there are n bikes then the no. of people are 2n+1. n are dropped in firs trip, in second trip 3 bikes are unused, so 2n-3 + n covers 2n+1 people. i.e. n + 2n – 3 = 2n +1
n = 4
No. of people = 9
we can draw 12 tangents, 4 for 2 circles and 12 for 3
circles
7, 8, 18, 57, 228, 1165, 6996
Ans : 228
7
(7*1)+1=8
(8*2)+2=18
(18*3)+3=57
(57*4)+4=232 [ given 228 ] odd
(232*5)+5=1165
(1165*6)+6=6996
From the first statement
Speed=distance/time
=>240/24=10m/s
so speed=10m/s
From the second statement
distance=length of the platform+length of the train=650+240=890m
Time=distance/speed
here, the speed of the train is already calculated
=>890/10=89s
So the time taken by the train to cross the platform is 89 seconds
To solve this problem, we can break it down into steps:
Step 1: Determine the individual rates of work for A, B, and C.
If A needs 8 days to finish the task, then their work rate is 1/8 of the task per day.
If B needs 12 days to finish the task, then their work rate is 1/12 of the task per day.
If C needs 16 days to finish the task, then their work rate is 1/16 of the task per day.
Step 2: Calculate the combined work rate of A and B.
If A works for 2 days, their contribution will be 2 * (1/8) = 1/4 of the task completed.
If B works until 25% of the job is left for C, then they will complete 75% of the task.
Step 3: Calculate the time it takes for B to complete 75% of the task.
Since B’s work rate is 1/12 of the task per day, it will take B (75%)/(1/12) = 9 days to complete 75% of the task.
Step 4: Calculate the remaining work for C.
If B completes 75% of the task, then the remaining work for C is 100% – 75% = 25% of the task.
Step 5: Calculate the time it takes for C to complete the remaining work.
Since C’s work rate is 1/16 of the task per day, it will take C (25%)/(1/16) = 4 days to complete the remaining 25% of the task.
Step 6: Calculate the total time required.
A worked for 2 days, B worked for 9 days, and C worked for 4 days, totaling 2 + 9 + 4 = 15 days.
Therefore, it will take a total of 15 days for A to work for 2 days, B to work until 25% of the job is left, and C to complete the remaining work.
The numbers that lie between 100 and 1000 which are divisible by 14 are 112, 126,140 …,994
a = 112; l = 994, d = 14
n= (l−a)/d+1
= (994-112)/14+1
= 64
Sn=n/2(l+a)
= 64/2(994+112)
= 32*1106
= 35392
9 years
Bcz 3×3=9
5×3=15
7×3=21
Total = 45
Avg of this 45/3 = 15
32
3*12=36
2:1