
Ques:- The H.C.F. and L.C.M. of two numbers are 12 and 336 respectively. If one of the numbers is 84, the other is
A. 24
B. 36
C. 48
D. 72
Ques:- One quality of wheat at Rs. 9.30 per kg is mixed with another quality at a certain rate in the ratio 8 : 7. If the mixture so formed be worth Rs. 10 per kg. What is the rate per kg of the second quality of wheat?
A. Rs. 10.30
B. Rs. 10.60
C. Rs. 10.80
D. Rs. 11
Ques:- A train of length 150 m takes 40.5 seconds to cross a tunnel of length of 300 m. The speed of the train (in km/hr) is
A. 13.33
B. 26.67
C. 38.32
D. 40