To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
45km
45km/hr
Total distance=1+(1/2)=3/2
Time in hours=60/2
Speed of train=3/2×(60/2)=45km/hr
Total distance covered by train = 1km + 0.5km =1.5km
Time is 2minutes, this convert to hour is 2/60 = 0.033
speed =distance/time
1.5/0.033
= 45.45km/hr
45.45 km/hr approx 45km/hr
In two minutes trains travels 1km
In one minute it will travels0.5km
1 hour = 60 minutes
Therefore it’s speed per hour is 0.5*60
i.e 30 km/h
Correct option is
B
∴ Speed of the train=45 km/hr
Total distance= 1km+0.5 km=1.5km=1500m
Time taken =2min=120seconds
Speed=distance/time=1500/120=12.5m/s
Speed( in km/hr)=12.5*18/5=45
30km/hr
because train passed 1km total distance starting bridge to ending take total time is 2 minitues
so that=1/0.033=30.30
d = 1000 + 500 (distance to drive in meter. bridge + train size)
t = 120 (2 minutes to second)
s = d / t (12.5 m/s)
convert m/s to km/h = x 3.6
12.5 x 3.6 = 45 km/h
the train drive 45 km/h
man saw a train when it has already covered half distance of the bridge so remaining distance of the bridge is 0.5km
The length of the train is half of the bridge = 0.5km
so total distance = 0.5+0.5=1KM
total time is 2min
so speed= 1/(2/60) = 30KM/Hr
formula
x m/s=x*(18/5) km/hr
1500/120=12.5
speed= 12.5*(18/5)
45
45KM
45km/hr
45km/h
45
S=(length of the train+/length of the bridge)/time
length of the train = length of the bridge/2 = 1km = 1000/2
time = 2 m = 2*60 = 120 s
S=(1500/120)*(18/5)=45 km/h
30km/hr
LENGTH OF BRIDGE = 1KM = 1000 M
LENGTH OF TRAIN = LENGTH OF BRIDGE/2 = 500 M
TOTAL DISTANCE = 1000 + 500 = 1500 M
IF TRAIN CROSS THE 1500 M IN 2 MINUTES
SPEED OF TRAIN = 1500 * 60/2
45000 M
45 KM
45
ridge Length of Bridge = 1 km =1000m
Length of train = half of Bridge = 1000/2 = 500m
total Distance Cover by the train = 1000 + 500 = 1500m
length of train = (1500*3600) / (120 * 1000) = 45 km/h
45 km/hr