A train of length 150 m takes 40.5 seconds to cross a tunnel of length of 300 m. The speed of the train (in km/hr) is

A train of length 150 m takes 40.5 seconds to cross a tunnel of length of 300 m. The speed of the train (in km/hr) is

Ques:- A train of length 150 m takes 40.5 seconds to cross a tunnel of length of 300 m. The speed of the train (in km/hr) is
A. 13.33
B. 26.67
C. 38.32
D. 40

27 8969

28 Answers on this Question

  1. 13.33
    total distance pased by train is 150m
    because, = tunnel length-train length
    =300-150
    =150m
    d=0.15km t=0.01125

    a=d/t
    =13.33

  2. length of train + tunnel length = total distance
    300+150=450
    Speed =distance / time
    = 450/40.5
    It’s was in meter/ second form. We need to convert it into km/hr. So we multiple with 3.6(i.e 3600/1000)
    =450/40.5*3.6
    =40 km/hr

  3. total distance = 150 + 300 = 450m
    Time = 40.5s

    Distance in km = 450/1000 = 0.45km
    Time in hr = 40.5/3600 = 0.01125hr
    Speed = distance/time => 0.45/0.01125 => 40km/hr

  4. Ans D. 40 Km/Hour
    The length L of the train is 150 Mts, distance to cover D is 300 Mts length of tunnel in time T 40.5 seconds
    (L + D)/T = (150+300)/40.5 = 450/40.5 = 11.11 Mts/Sec
    Converting the same to Kms/Hour
    11.11 * 3600 /1000 = 40 KM/Hour

  5. Since the total train length passed the tunnel so the distance would be the length of train added to the tunnel legth
    D=150+300=450 mt.
    speed = distance/time
    speed = 450/(40.5/3600)
    speed =40,000 mt/sec.
    answer is D

  6. Since the total train length passed the tunnel so the distance would be the length of train added to the tunnel legth
    D=150+300=450 mt.
    speed = distance/time
    speed = 450/(40.5/3600)
    speed =40,000 mt/sec

  7. Since the total train length passed the tunnel so the distance would be the length of train added to the tunnel legth
    D=150+300=450 mt.
    speed = distance/time
    speed = 450/(40.5/3600)
    speed =40,000 mt/sec

Leave a Reply

Your email address will not be published. Required fields are marked *

Scroll to top