Ravi do a work in 30 days Prakash do a work in 40days then both work together 1/30+1/40=70/1200 then solve values 120/7 is 17(1/7) days Reply
(1/30)+(1/40)=7/120
=>120/7=17.14 days
In 17.14 days, both can together finish the work
Ravi do a work in 30 days
Prakash do a work in 40days
then both work together 1/30+1/40=70/1200
then solve values 120/7 is 17(1/7) days